Proceedings

Handling Alternative Activities in Resource-Constrained Project Scheduling Problems

Download BibTeX Cite

Proceedings of the Twentieth International Joint Conference on Artificial Intelligence. Pages 1960-1964.

© 2007 International Joint Conferences on Artificial Intelligence

Abstract

In the context of operative disruption management, decision support systems have to evaluate the typically manifold options of responding to disturbances: The temporal shift of activities and the allocation of alternative resources can be assessed by the application of generic scheduling frameworks such as the Resource-Constrained Project Scheduling Problem (RCPSP). However, switches from one process variant to another one are usually not supported by the corresponding models, even though they represent a common way of repairing broken schedules in many practical domains. In this paper, we thus show how the RCPSP can be extended by the concept of alternative activities, making it possible to model and search within alternative process execution paths. Beside a formal description of the conceptual extension, we show how such generalized rescheduling problems can be solved by a novel genetic algorithm and summarize the promising results of a detailed evaluation.

  1. [Alcaraz et al., 2003] J. Alcaraz, C. Maroto, and R. Ruiz. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms. Journal of the Operational Research Society, 54(6):614-626, 2003.
  2. [Artigues et al., 2003] C. Artigues, P. Michelon, and S. Reusser. Insertion techniques for static and dynamic resource constrained project scheduling. European Journal of Operational Research, 149:249-267, 2003.
  3. [Barták, 1999] R. Barták. Conceptual models for combined planning and scheduling. In Proceedings of CP99 Work- shop on Large Scale Combinatorial Optimisation and Constraints, pages 2-14, 1999.
  4. [Beck and Fox, 2000] J.C. Beck and M.S. Fox. Constraint directed techniques for scheduling with alternative activi- ties. Artificial Intelligence, 121:211-250, 2000.
  5. [Błazewicz et al., 1983] J. Błazewicz, J. K. Lenstra, and A.H.G. Rinnooy Kan. Scheduling projects to resource constraints: Classification and complexity. Discrete Ap- plied Mathematics, 5:11-24, 1983.
  6. [Brucker et al., 1999] P. Brucker, A. Drexl, R. Möhring, K. Neumann, and E. Pesch. Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 1999.
  7. [Carr, 2004] F. R. Carr. Robust Decision Support Tools for Airport Surface Traffic. PhD thesis, 2004.
  8. [Clausen et al., 2001] J. Clausen, J. Hansen, J. Larsen, and A. Larsen. Disruption management. ORMS Today, 2001.
  9. [Elkhyari et al., 2004] A. Elkhyari, C. Guret, and N. Jussien. Constraint programming for dynamic scheduling prob- lems. In Hiroshi Kise, editor, ISS'04 International Scheduling Symposium, pages 84-89, Japan, 2004.
  10. [Hartmann, 1998] S. Hartmann. A competitive genetic algo- rithm for resource-constrained project scheduling. Naval Research Logistics, 45:733-750, 1998.
  11. [Hartmann, 2001] S. Hartmann. Project scheduling with multiple modes: A genetic algorithm. Annals of Opera- tions Research, 102(1-4):111-135, 2001.
  12. [Hindi et al., 2002] K.S. Hindi, H. Yang, and K. Fleszar. An evolutionary algorithm for resource-constrained project scheduling. IEEE Transactions on Evolutionary Compu- tation, 6(5):512-518, 2002.
  13. [Kolisch and Hartmann, 2005] R. Kolisch and S. Hartmann. Experimental investigation of heuristics for resource- constrained project scheduling: An update. European Journal of Operational Research, 2005.
  14. [Kolisch et al., 1995] R. Kolisch, A. Sprecher, and A. Drexl. Characterization and generation of a general class of resource-constrained project scheduling problems. Man- agement Science, 41:1693-1703, 1995.
  15. [Laborie, 2005] P. Laborie. Complete MCS-based search: Application to resource constrained project scheduling. In IJCAI-05, pages 181-186, 2005. IJCAI
  16. [Policella and Rasconi, 2005] N. Policella and R. Rasconi. Testsets generation for reactive scheduling. In Workshop on Experimental Analysis and Benchmarks for AI Algo- rithms, 2005.
  17. [Yu and Qi, 2004] G. Yu and X. Qi. Disruption Manage- ment: Framework, Models and Applications. World Sci- entific Publishing, Singapore, 2004.
  18. [Zhu et al., 2005] G. Zhu, J.F. Bard, and G. Yu. Disruption management for resource-constrained project scheduling. Journal of the Operational Research Society, 56, 2005.

References were extracted automatically from the PDF and may contain errors.

Welcome Future Conferences AI Journal Division IJCAI Proceedings About IJCAI IJCAI Awards