Proceedings

Proactive Algorithms for Scheduling with Probabilistic Durations

Download BibTeX Cite

Proceedings of the Nineteenth International Joint Conference on Artificial Intelligence. Pages 1201-1205.

© 2005 International Joint Conferences on Artificial Intelligence

Abstract

Proactive scheduling seeks to generate high quality solutions despite execution time uncertainty. Building on work in [Beck and Wilson, 2004], we conduct an empirical study of a number of algorithms for the job shop scheduling problem with probabilistic durations. The main contributions of this paper are: the introduction and empirical analysis of a novel constraint-based search technique that can be applied beyond probabilistic scheduling problems, the introduction and empirical analysis of a number of deterministic filtering algorithms for probabilistic job shop scheduling, and the identification of a number of problem characteristics that contribute to algorithm performance.

  1. [Beck and Fox, 2000] J. C. Beck and M. S. Fox. Dy- namic problem structure analysis as a basis for constraint- directed scheduling heuristics. Artificial Intelligence, 117(1):31-81, 2000.
  2. [Beck and Wilson, 2004] J.C. Beck and N. Wilson. Job shop scheduling with probabilistic durations. In Proceedings of the Sixteenth European Conference on Artificial Intelli- gence (ECAI04), pages 652-656, 2004.
  3. [Garey and Johnson, 1979] M. R. Garey and D. S. Johnson. Computers and Intractability: A Guide to the Theory of NP-Completeness. W.H. Freeman and Company, New York, 1979.
  4. [Laborie, 2003] P. Laborie. Algorithms for propagating re- source constraints in AI planning and scheduling: Exist- ing approaches and new results. Artificial Intelligence, 143:151-188, January 2003.
  5. [Le Pape et al., 1994] C. Le Pape, P. Couronné, D. Vergamini, and V. Gosselin. Time-versus-capacity compromises in project scheduling. In Proceedings of the Thirteenth Workshop of the UK Planning Special Interest Group, 1994.
  6. [Nowicki and Smutnicki, 1996] E. Nowicki and C. Smut- nicki. A fast taboo search algorithm for the job shop prob- lem. Management Science, 42(6):797-813, 1996.
  7. [Nuijten, 1994] W. P. M. Nuijten. Time and resource con- strained scheduling: a constraint satisfaction approach. PhD thesis, Department of Mathematics and Computing Science, Eindhoven University of Technology, 1994.
  8. R Development Core Team. R: A language and environment for statistical computing. R Foundation for Statistical Computing, Vienna, Austria, 2004. ISBN 3-900051-07-0.
  9. [Watson et al., 2002] J.-P. Watson, L. Barbulescu, L.D. Whitley, and A.E. Howe. Contrasting structured and ran- dom permutation flow-shop scheduling problems: search- space topology and algorithm performance. INFORMS Journal on Computing, 14(1), 2002.

References were extracted automatically from the PDF and may contain errors.

Welcome Future Conferences AI Journal Division IJCAI Proceedings About IJCAI IJCAI Awards